Spotting bad construction or restoration work leaves homeowners struggling to figure out if visible flaws like uneven tiles, poor waterproofing, or missed deadlines are normal or require tearing things out and starting over. Without clear standards, people are left second-guessing what they see and stressing over whether to confront the contractor.
What the numbers show
Counted from the threads quoted below. How we count
- This comes up 42.6× more often in r/Roofing than across the site as a whole.
What people tried
Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.
- 1seeking opinions from online communities
- 2hiring professional restoration workers for inspections
- 3asking for the owner or project manager to stop by to chat
- 4consulting online resources and asking family members for advice on whether specific installation methods are legitimate
- 5considering whether to make contractors rip out the work and start over
In their words
Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.
“I think it's Grade 2 listed, and I'm dubious as to the quality of the job being done on it.”source ↗
“Does this just look worse than it is?”source ↗
“That's really bad. I do a lot of restoration work. That's bad. It's even worse than it looks.”source ↗
“It looks like shit but honestly...if its flat and nailed off its gonna stay dry, just wouldn't wanna walk on it. It should be done better but is likely lowest bidder type shit.”source ↗
“So far things have looked pretty good, and I've been happy with what I've seen. But this shower really worries me.”source ↗
“Everything I'm reading online says that when cement board is used an additional layer of water proofing should be done.”source ↗
“I'm really concerned about this.”source ↗
“I guess I'm just looking to see how others would handle this. Would you make them rip out the whole shower and start again?”source ↗
“I'm really frustrated because we're now on week 4 of what they originally told me would be a 2.5 week timeframe, and they're randomly taking 2 days off in the middle of tiling, and I'm finding these problems.”source ↗
Where this came up
People with this problem also raised
- 39How to tell if a new roof was installed correctly
- 10Is newly finished contractor work actually acceptable?
- 19How to tell if boiler and plumbing installation was done right
- 93How do I know if a contractor quote is fair?
- 96How to handle a bad contractor who won't fix poor work
- 2Are gaps in underfloor heating normal?