Said It Here

Doing plumbing surgery without cutting Sheetrock

When management blocks you from cutting Sheetrock or you are stuck dealing with 120 PSI water pressure and tight device placement like a Moen Flo, standard repairs turn into hours of awkward, restrictive surgery. These physical constraints and high-pressure conditions make routine installations frustratingly difficult and time-consuming.

What people tried

Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.

  1. 1
    Working around restrictions instead of making proper access cuts
  2. 2
    Placing a pressure-reducing valve (PRV) ahead of the device to reduce the water pressure to recommended levels
  3. 3
    Running the device or plumbing at higher pressures and risking system stress

In their words

Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.

r/Plumbing2 people · September 2026 – October 2026

“Just had to do surgery on a flange for 2 1/2 hours because management wouldn’t let me cut Sheetrock below.”source ↗

ShroomSpoonsOfDoom · r/Plumbing · 4 upvotes

“Trying to figure out where to put a Moen Flo.”source ↗

“Problem is, the unregulated side seems to be around **120 PSI**.”source ↗

“Would you install it there at 120 PSI, or move/add a PRV ahead of it?”source ↗

Different-Strength-6 · r/Plumbing

Where this came up

People with this problem also raised