Contractor poured concrete over basement floor access holes

Contractors sometimes fill uncovered floor access holes and cleanouts with concrete without asking homeowners first. This eliminates critical secondary drain access, leaving homeowners with no way to reach the pipes except through the backflow prevention device.

Overview
People affected3 accounts across 2 forums
Workarounds found3 items attempted
Community agreement4 total upvotes

What people tried

Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.

Found another way around this?

Share your steps and trade-offs so fellow engineers don't have to reinvent the wheel. No account required.

  1. 1
    Waiting for the contractor to return and clarify
    Did this help you?
  2. 2
    Tapping the concrete with a hammer to see if it cracks out
    Did this help you?
  3. 3
    planning to tamp the area down, apply bonding agent to the edges, and fill it with pre-mixed concrete
    Did this help you?

In their words

Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.

r/homeowners1 person · September 2026

“I have exactly 0 experience with concrete work.”source ↗

“Am I on the right track?”source ↗

“Can I pour this all in one go?”source ↗

“Any tips for sloping it around the floor drain?”source ↗

“Thank you for entertaining my ignorance.”source ↗

helirob1 · r/homeowners · 6 upvotes
r/Plumbing2 people · September 2026

“It appears that they opened both covers of the holes and filled them with concrete as well.”source ↗

EdTechYYC · r/Plumbing · 1 upvotes

“the fact that he filled them up with out asking is concerning to me”source ↗

Royal_Thanks_469 · r/Plumbing · 1 upvotes

“I question it because there is no other drain access other than the backflow prevention device one.”source ↗

EdTechYYC · r/Plumbing · 1 upvotes