Do I need a vapor barrier over rigid foam in a basement?
If you already have rigid foam against the concrete, you generally should not install an additional polyethylene vapor barrier over your framing. Conflicting advice leaves homeowners guessing whether a 6 mm poly layer is required before drywall, making it difficult to finish basement walls with confidence.
What people tried
Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.
- 1Consulting building codes and inspector opinions
- 2Relying on the rigid foam to act as its own vapor barrier without adding polyethylene sheeting
In their words
Unedited, most upvoted first, each linked to the thread it came from.
“I've seen very mixed reviews, do I need a 6 mm poly vapour barrier on top of my studs/batts before drywall? Or do I not need it since I have the XPS?”source ↗
“With that amount of rigid Foam against the concrete you should not put up a vapour barrier.”source ↗
Where this came up
People with this problem also raised
- 2Can I insulate and finish basement walls if they get damp?
- 3Do I need a moisture barrier under basement LVP flooring?
- 2Is underlayment required under slate, tile, or thatch roofs?
- 2Can you use fiberglass insulation in a basement after flooding?
- 2Is old black flooring adhesive safe to remove?
- 15Water dripping from electrical switches behind walls