Said It Here

Why do I always underestimate landscaping gravel and materials?

People consistently forget to account for a waste percentage like 10% and fail to calculate the required depth accurately. This miscalculation leaves them halfway through a project with shortages, forcing endless extra wheelbarrow trips or leading them to overbuy on purpose just to avoid running out.

What people tried

Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.

  1. 1
    Using online yard calculators
  2. 2
    Adding 10% to the calculated estimate
  3. 3
    Overbuying materials on purpose

In their words

Unedited, most upvoted first, each linked to the thread it came from.

i always forget the 10% part until i'm halfway through the project and realize i'm gonna be shortsource ↗

my last one i was off by like 15% somehow. the wheelbarrow trips were endless. now i overbuy on purpose, leftover gravel just becomes a problem for future mesource ↗

Significant-Pen6087 · r/Landscaping · 1 upvotes

I always failed to calculate the depth into it.source ↗

vividlyaugust · r/Landscaping · 1 upvotes

Where this came up

People with this problem also raised