Said It Here

What to do with excess pipe sticking out of the wall

The cover ring often does not provide enough coverage to hide the exposed plumbing. You are left having to cut off the excess, embed the wall fitting deeper, or lose valuable room space framing around it when finishing a basement.

Overview
People affected2 accounts across 1 forum
Workarounds found5 items attempted
Community agreement3 total upvotes

What people tried

Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.

Found another way around this?

Share your steps and trade-offs so fellow engineers don't have to reinvent the wheel. No account required.

  1. 1
    Considering cutting off the excess threaded pipe
    Did this help you?
  2. 2
    Embedding the 90-degree wall fitting deeper into the shower wall
    Did this help you?
  3. 3
    Chop out the existing wye fitting and install a double wye.
    Did this help you?
  4. 4
    Raise all the drainage pipes and tie them in vertically.
    Did this help you?
  5. 5
    Raise the drainage and drop it into a wye on its back.
    Did this help you?
Tried another approach not listed above?+ Share your workaround ↑

In their words

Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.

r/Plumbing2 people · October 2026 – November 2026

“What do I do with this? Do I cut off the excess?”source ↗

sandolllars · r/Plumbing · 1 upvotes

“The ring is only 4mm so not much coverage there. I guess I have to embed the wall fitting deeper.”source ↗

sandolllars · r/Plumbing · 1 upvotes

“Builder has this configuration made for the final drainage/cleanout. I want to finish the basement and don’t want to lose a bunch of space framing around it. What are my options to bring it in closer to the wall?”source ↗

LithiumLemming · r/Plumbing

Where this came up

People with this problem also raised