Said It Here

How to fill a 4-inch gap under an acrylic tub

Standard tutorials recommend one to two inches of mortar, but a four-inch gap requires an excessive amount of material that is heavy and likely to crack. Because plumbers often refuse to install a mortar base, DIYers are forced to bridge this deep space themselves without proper guidance, leading to structural sagging or failed installations.

What people tried

Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.

  1. 1
    Mixing the mortar on a stiffer consistency and forming staggered mounds to support the tub without leveling on its own
  2. 2
    Filling the base of the tub with water while the mortar sets
  3. 3
    Hiring a concrete specialist or having an insulation company foam the gap
  4. 4
    Using closed cell backer rod as filler before applying silicone
  5. 5
    Using canned spray foam

In their words

Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.

r/Plumbing3 people · October 2025 – September 2026

I need to redo mine because someone didn’t do this, and it looks like trash now.source ↗

co678 · r/Plumbing · 114 upvotes

Wish I had seen this comment five years ago. I had the same problem and did not solve it correctly.source ↗

SickDaySidney · r/Plumbing · 15 upvotes

No plumber in my area was willing to do a mortar base during the installation of our acrylic tub so I’m having to do it myself.source ↗

Can anyone please advise on the best way to fill the gap under the tub? Most online tutorials recommend 1-2” of mortar which should touch the belly of the tub, but mine sits ~4” off the ground and would require a ridiculous amount of mortar that would probably crack.source ↗

Conscious_Degree278 · r/Plumbing · 2 upvotes

Where this came up

People with this problem also raised