Unexpected construction change orders after the project is done
Contractors sometimes spring massive price increases—such as a 62 percent markup—after a job is finished without ever providing a prior written cost estimate or specific numbers beforehand. This sudden financial shock leaves homeowners scrambling to figure out how hard to push back against verbal estimates and misjudged work.
What people tried
Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.
- 1Offering to pay only the original contract amount while negotiating a separate reduced number for the change order
- 2Accepting dimensional lumber if the material is fastened correctly and not in gaps
- 3Trusting that the roofer mentioned potential plywood needs beforehand to avoid surprise extra charges
In their words
Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.
“Concerned that he misjudged the situation.”source ↗
“Up until installation day after the roof was stripped he said it was no longer necessary.”source ↗
“Roofer hit me with a $3,612 change order on a $5,800 mansard job. How hard should I push back?”source ↗
“After completion I got a change order for $3,612, a 62% increase.”source ↗
“Mid-install the foreman told me verbally there would be "some additional cost." No number given.”source ↗
Where this came up
People with this problem also raised
- 5Why do restaurant buildouts and renovations always take months longer?
- 14Why are equipment service bills so expensive for minor fixes?
- 5Can you change builder plans after construction starts?
- 40Why are contractor and window replacement quotes so absurdly high?
- 6How do you manage DCIM and IPAM data in a GitOps workflow?
- 4How to find a new wedding dress tailor after yours closes