How to manage a project when the boss is the bottleneck
Unapproved designs and micromanaged sign-offs stall timelines while urgent tasks crowd out secondary work, making standard scheduling tools ineffective. Trying to track these hidden bottlenecks in a Gantt chart fails because the actual delays stem from waiting on executive approval rather than task volume.
What people tried
Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.
- 1validating the delivery plan during the contracting/pre-mobilisation period
- 2mapping dependencies in scheduling software
- 3asking experienced peers for advice
- 4Keeping separate Gantt charts and continually readjusting them to show rolling delays
- 5Meshing multiple projects into one larger master schedule
- 6Modelling bottlenecks and competing resource drains directly into the project timeline tasks
In their words
Unedited, most upvoted first, each linked to the thread it came from.
“What would you do in this scenario? Keep readjusting your individual Gantt for each project to show delays or do them all in one and probably be closer to target? I’m not sure.”source ↗
“Project “a” taking so much priority that they would stop working in b and c and work on them sparingly and because my manager has to do the approval of designs and all details.”source ↗
“I’m concerned how we can deliver on time, in scope and without going over the budget and going insane 🤣”source ↗
“the reason your dates keep slipping is not the number of charts. It is that the two things eating your timeline are not on the timeline.”source ↗
“Honestly sometimes what sucks is that resources are available and ready to go but because the manager who does all approvals is the major bottleneck”source ↗
Where this came up
People with this problem also raised
- 5How to work on low energy days without feeling guilty
- 2How to handle project management and coding at the same time
- 3How to handle too much work without project engineers or coordinators
- 2Why is our IT department forced to scavenge old hardware?
- 7How to survive a completely mismanaged project with terrible leadership
- 6Why is setting up NetSuite so confusing?